| Place of Origin: | CHINA |
| نام تجاری: | FLAME |
| گ执: | ISO9001:2000,CE |
| 型号: | SJSZ65 or SJSZ80 |
| 最小起订量: | 1 set |
|---|---|
| قیمت: | USD42,000~58,000/set |
| Packaging Details: | Standard Export Packing |
| Delivery Time: | 30 working days |
| Payment Terms: | t/t, |
| Supply Ability: | 3套/ 30天 |
| Pipe diameter: | 16-160 | Motor: | Variable frequency motor |
|---|---|---|---|
| Frequency converter: | ABB | Output: | 100-350kg/h |
| 之: | 挤出塑料机,HDPE管道挤出机 |
||
1. Introduction of Product
16-160mm PVC Double Electrical Threading Pipe Extruding Production Line
The production line is developed by absorbing 1990’ West European advanced technology. Main machine is SJSZ 65/132 or SJSZ80/156 cone double screws squeezer, equipped with double tubes single-controlled stainless steel spraying shaper. When one tube is being adjusted, the another will not be affected. Automatic single-controlled double tractor and cutter are mixed together with previous double shaping technology, which makes the operation easier. You can separately control and make double tubes work at the same time.
2.快速细节:
Raw material+additive→mixing→conveying feeding→force feeding→conical double screw extruder→one module two pipe mould→calibrator→double spray vacuum calibration tank→ink printer→double belt haul-off→double uplift cutter→double pipe rack→finished product inspecting & packing
3.描述:
Extruder:
Parts |
不 |
Name |
Brand |
1.1 Electric parts |
1 |
Inverter |
Switzerland ABB |
2 |
Contactor |
Schneider |
|
3 |
Relay |
Schneider |
|
4 |
Temperature meter |
RKC仪表 |
|
5 |
Breaker |
Delixi |
|
1.2 Driving parts |
1 |
Motor |
西门子交流电机 |
2 |
齿轮箱 |
中国顶级品牌 |
|
1.3 Screw and barrel |
1 |
技术 |
采用德国技术 |
2 |
主要材料 |
38CrMoALA |
|
3 |
The barrel is equipped with vacuum system |
||
4 |
螺钉配备了恒温器系统 |
||
5 |
Heating ring |
Cast aluminum heating ring |
|
1.4 Calibrated feeding device |
1 |
Speed controller |
ABB逆变器 |
2 |
它配备了搅拌设备 |
||
1.5保护系统 |
1 |
Screw dislocation protection |
|
2 |
当前的过载保护 |
||
3 |
A full set alarming system |
||
2 Mold
不 |
Name |
Specs |
2.1 |
主要材料 |
Mould steel |
2.2 |
Temperature control system |
Japanese RKC temperature meter |
2.3 |
Parts processing |
By the CNC |
2.4 |
Heating ring |
云母加热器 |
3 Vacuum calibration tank
不 |
Name |
Specs |
3.1 |
Main material |
Stainless steel |
3.2 |
Water and vacuum pump from shanghai |
|
3.3 |
Main electric parts |
Schneider |
3.4 |
校准箱配备了水温和真空度监督装置。 |
|
4 Hahuler
不 |
Name |
Specs |
4.1 |
拖动马达 |
Teco伺服电机 |
4.2 |
齿轮箱 |
Densen (Germany joint venture) |
4.3 |
Main electrics |
Schneider brand |
4.4 |
Hauling type |
毛毛虫类型 |
5 Cutter
不 |
Name |
Specs |
5.1 |
Cutting type |
Planetary cutter |
5.2 |
控制系统 |
Schneider PLC |
5.3 |
Main electric |
Schneider |
5.4 |
切刀配备了倒角装置 |
|
6堆栈:
不 |
Name |
Specs |
6.1 |
Main material |
Stainless steel |
6.2 |
堆叠类型 |
Auto stacking |



4. Applications:
Mainly applying in water-supply pipe, drainage pipe, electrical threading pipe and other area.
5. Specifications:
挤出机模型 |
Pipe range |
Output |
Total power |
Line length |
SJSZ-51/105 |
16-40mm |
80-120 kg/h |
50KW |
20000mm |
SJSZ-65/132 |
16-63mm |
120-250kg/h |
100kW |
22000mm |
| SJSZ-80/156 | 50-160 | 300-400kg/h | 120KW | 25000mm |
6.竞争优势:
The production line is developed with the advanced technology of West Europe by our company. The main machine is SJSZ 51/105 or SJSZ65/132 conical twin screw extruder is equipped with double-tube single-control stainless steel spraying calibration. It avoids waste combined with the front double calibration technology to make operation more flexible. Let you enjoy economic benefit which is brought by separate-control double-tube extruding.
7.服务:
-- Before shipment, we would invite you to come to our factory to test the machines.
-- After the machine was shipped to your factory, we would send our engineer to your factory to install the machine and communicate with your engineers.
-- After the installation, we would reply to your problem within 24 hours. If you necessary, we would send our engineer to your factory according to your requirements.
8.选项
The line is mainly for producing PVC-U pipes for wire and cable.
It can extrude two pipes at one time, which enhances production efficiency dramatically.
Each pipe is hauled off and cut individually, which effectively lowers unqualified ratio in pipe production.
9.商业条款
1. Payment: 30% by T/T as advance payment, balance(70%) by T/T before shipment
2.交货时间:收到预付款后60天
3.运输:容器,简单包装(PE胶片,Salver)
4. Warranty时期:从买方工厂使用机器的那天:
(1)机械零件:12个月
(2) The electrical Parts: 6 months
5.装置和调试
(1)已发货之前进行了最新调试
(2) Overseas Commissioning and charges
如果客户要求,将发送一两个技术人员将被发送给买方,以指导设备的安装和调试。
客户支付了我们的技术人员的指控。
(1) Round-trip Airplane Ticket
(2) Charges of transportation, accommodation and communication
(3)技术人员的津贴为一个人每天80美元。
(4)需要解释器。
6.备件:
客户需要一年的备件,我们建议客户应该购买备件。(将提供配件列表。)
7. English manual, Figuration drawing, and footing drawings are provided.